| |
Waterproof case being leveled and mounted.
Cases mounted and ready for connection.
Wires being pulled and marked for phases.
Wires being connected to load side of disconnect.
Wires prior to connection, one connected.
Wires spliced only ground wire left to be connected to self grounding box.
3 phase power factor correction units connected to load side of disconnect.
Single phase power factor correction unit.
Single phase wires connected to load side of disconnect.
Roof top mounting on side of a/c unit with wires pulled.
Roof top wires being connected to load side of disconnect.
Roof top power factor correction unit connected to load side of a/c unit disconnect.
Send mail to
General Information:
gthompson@arcomgroup.net
Chinese:
lvbingbing@arcomgroup.net
Copyright © 1989-2014 ARCOM Group, Inc. |